Dual-gauge or mixed-gauge railway is a special configuration of railway track, allowing trains of different gauges to use the same track. Generally dual-gauge railway consists of three rails, rather than the standard two rails. The two outer rails give the wider gauge, while one of the outer rails and the inner rail give a narrower gauge. Thus one of the three rails is common to all traffic. (This configuration isn't to be confused with the electric third-rail.)

Reasoning

In allowing railway tracks of different gauges to share the same alignment, costs can be reduced, especially where there are bridges and tunnels. Dual-gauge can replace two separate tracks, having two rails each, with one track with three rails. This allows one rail fewer for the stretch of the dual gauge line, but there are complications and costs that may offset the savings.
   One issue is points (US: switches). Complicated arrangements are necessary to ensure traffic of both gauges can safely utilise points. Signalling may also be complicated somewhat, as all three rails must be connected to track circuits or mechanical interlocking arrangements. Mixed gauge is simpler to signal with electric signals than with mechanical signals. Since rails wear very slowly, the extra tonnage on the common rail isn't a problem.
   Dual-gauge turnouts will be complicated, expensive, and suitable for low speeds only.

Configuration

For dual-gauge track to be achievable using three rails, the difference between the gauges needs to be at least as wide as the foot of the rail, otherwise there's no room for the rail fastening hardware (spikes, clips, and the like). Thus standard gauge and can be dual gauged without problem, while and (Victorian broad gauge) can also be dual-gauged, albeit with lighter narrow footed rails, as shown in Victoria, Australia (where the majority of the railways use the 1600 mm gauge). On the other hand, and as found in Africa, or and, as found in South America, are too close to be combined into three-rail dual gauge.
   If three-rail dual gauge is impossible, four-rail dual gauge has to be used.

Configuration for Africa

and gauges found in Africa are too close to allow three-rail dual gauge: four-rail dual gauge is required. With a little care, the sleepers for this dual gauge configuration can be made to support triple gauge, including standard gauge, at little extra cost. Image:Dual Gauge Africa 3 Rail Impossible.jpg|1000 mm and 1067 mm gauges are too close to allow three-rail dual gauge Image:Dual Gauge Africa 4 Rail 2 Gauge.jpg|1000 mm and 1067 mm gauges can be used together with four-rail dual gauge; note the useless 1267 gauge Image:Dual Gauge Africa 4 Rail 3 Gauge.jpg|1000 mm and 1067 mm gauges can be used together with four-rail dual gauge, with bonus 1435 mm gauge An advantage of the four-rail dual gauge track is that the four rails combined to give some of the greater strength of two rails of double the weight. The allows the old rails to be reused, instead of being scrapped or used for fenceposts.

Example in Africa

2007

2006

An Indian proposal surfaced to link Benin and Togo on the coast with landlocked Burkina Faso and Niger. The other adjacent state of Ghana and Nigeria use the incompatible 1067 mm gauge. With the future in mind, steel and concrete sleepers, at least between stations, can and should cater for three gauges, 1000 mm, 1067 mm and 1435 mm.

2004

On 12 October 2004, a proposal was announced to develop an electrified rail link connecting Kenya, Uganda and south Sudan. Even though Kenya and Uganda use 1000 mm gauge and Sudan uses 1067 mm, the new project was proposing to use standard gauge (1435 mm). Fortunately, all three gauges can be supported by the same sleepers, as described above.

Gauge conversion

The complications and difficulties outlined show how important it's to ensure that railway gauges are standardised in the first place, if at all possible. If a railway operator seeks to convert from one gauge to another, then it helps if a dual-gauge intermediate step can be done (this has often been actually practised in the past).
   If the gauge is to be reduced, then the sleepers can continue to protrude from the side of the rails. If the gauge is to be increased, then the sleepers used for narrow gauge may be too short, and some at least of these 'short' sleepers will have to be replaced with longer ones. Alternatively the rails may be too light for the loads imposed by broader-gauge railcars. Such potential problems can rule out dual-gauge as a feasible option. Another issue is affixing the rails to the sleepers (spikes, nails or bolts are used). If existing sleepers are wooden, extra holes can be drilled without problems. If the existing sleepers are concrete, then drilling extra holes is impractical, and the whole sleeper has to be replaced, unless extra boltholes are already allowed for.
   During the conversion of the Melbourne to Adelaide line in Australia from to, dual gauge with heavy rails wasn't possible as the rail footings were too wide. A special gauge-convertible sleeper with a reversible chair for the Pandrol clip allowed a two-week conversion process.
   In the Adelaide metropolitan area, broad-gauge timber sleepers are being replaced with gauge-convertible concrete sleepers, in case of future gauge conversion.
   During WWI and WWII, gauge conversion occurred backwards and forwards between Germany and Russia as the fronts and national borders chopped and changed.
   The dual-gauge lines in Java were regauged to Cape gauge (to ) during the Japanese administration in 1942-1943. Actual regauging only occurred on the relatively short Brumbung-Kedungjati-Gundih main line and the Kedungjati-Ambarawa branch line, as the rest of the line was already dual-gauge (some only recently dual-gauged).

Proposed or current gauge conversions

  • Nigeria - has one standard gauge line, has one with gauge convertible sleepers, and is proposing to convert its narrow gauge lines to standard gauge and to build a much expanded standard gauge system.
  • Tanzania is proposing to convert its Central Line to standard gauge.
  • Afghanistan has next to no railways, while its four neighbours have three gauges between them. Some of the rail lines in Afghanistan would be for transit traffic. The choice of gauge is therefore likely to be a mix of single gauge lines compatible with adjacent systems plus dual or parallel gauge lines.
  • Australia - a missing link railway in Queensland is likely to be made dual gauge compatible for future use as part of the so-called Inland Railway connecting Melbourne and Gladstone.
  • Australia - the new port of Oakajee was previously to be served by separate narrow gauge and standard gauge lines, but Westnet, the track authority, has proposed a common network with a significan length of double track dual gauge which has greater flexibility.
  • Mauritania - a proposed (2007) phosphate railway in the south between the mine at Bofal and the port at Nouakchott would probably be standard gauge even though there's no connection with an existing standard gauge railway in the north, and even though just across the border lies a metre gauge railway.
  • 2007 - Ghana - several reports about conversion to 1435mm gauge.
  • Kenya May, 2008 - Kenya - several reports about conversion to 1435mm gauge.

    Cost of an example

  • Pakistan - In 2005, Pakistan Railways started work on the conversion of the 128 km Mirpurkhas to Khokhrapar line from to gauge. The cost was set at Rs 1,800,000,000 (US$30,000,000), or about US$ 250,000 per km.

    Examples

    In the Czech Republic, there's dual gauge (1435 mm and 760 mm) track near Jindřichův Hradec. Interestingly, the two gauges are used by different railway companies.
       In Britain, the Great Western Railway was initially broad gauge. After the "gauge war", it was decided to regauge the GWR. As the broad gauge was sufficiently dissimilar from standard gauge and used wooden sleepers, dual gauge was easily introduced for running new standard-gauge traffic. The Metropolitan Railway, part of the London Underground system, also started out as dual-gauge; however, its current third and fourth rails are for electricity supply, not dual gauge.
       In Ireland, dual-gauge track wasn't used in regauging the Ulster Railway (UR). When it regauged its double-track route from 1880 mm (6 ft 2 in) to the new standard of it performed the task in two stages. The Dublin & Drogheda Railway (D&DR) meanwhile was regauging from 1575 mm (5 ft 2 in), too similar to the new gauge to allow dual gauge. Dual gauge was used in Derry, by the Port Authority, in an on-street network to transfer goods, on either gauge, between the city's four stations (two narrow gauge, two 5 ft 3 in broad gauge).
       In Italy, dual-gauge track is used in the line Potenza - Avigliano Lucania (1435) and (950).
       In France, the Chemin de Fer de la Baie de Somme is dual gauge between Noyelles-sur-Mer and Saint-Valery-sur-Somme. the line being metre gauge laid within standard gauge, thus having four rails.
       In Western Australia, there's a double-track dual-gauge (& ) main line from East Perth to Northam, about 120 km. Dual-gauge track is also used from the triangle at Woodbridge to Cockburn Junction, then to Kwinana on one branch, and North Fremantle on the other.
       In Brisbane, Australia, shorter stretches of dual-gauge track (& ) exist between the rail freight yards at Acacia Ridge and the Port of Brisbane for freight trains. A dual-gauge line branches off at Park Road Station to run alongside electric suburban narrow gauge Citytrain services over the Merivale Bridge into Platform 1 at Roma Street Station. This is used by standard-gauge interstate CountryLink XPT services to Sydney.
       In Belgium, some sections of tram track in Brussels combined metre gauge for the interurban trams with standard gauge for the urban trams. Since the closure of the former, these have been replaced with standard gauge track.
       In Stuttgart, Germany, the tram lines were 1000 mm gauge. In the 1970s it was decided to convert the streetcar system to a modern Stadtbahn and regauge it to standard gauge to increase capacity. Inner-city tunnels replacing street-level sections in busy streets were built with a cross-section suitable for standard-gauge cars. After the conversion started in 1981 with the commissioning of the first three class DT-8 Stadtbahn cars, the tunnels and all other sections used by multiple lines were fitted with 1435 mm / 1000 mm dual-gauge track, to allow both old-style streetcars and new Stadtbahn cars to share those sections while lines were converted one by one over the next decades. In 2006, conversion of line 15 (the last line to be converted) is under way and expected to be complete around 2008, although some sections will retain their dual-gauge track indefinitely as a courtesy to the streetcar museum of Stuttgart, which will operate old 1000 mm gauge streetcars on weekends and special occasions.
       In Switzerland dual gauge (standard and meter) is used in the stations at both ends of the Brünigbahn (Lucerne and Interlaken), as well as on the RhB between Chur and Domat Ems (see first illustration of this article), among other places.
       In Japan, dual gauge is used when the Shinkansen system, which is standard gauge, joins the narrow-gauge (1067 mm) system, which is the national standard. For example, part of the Ōu line became part of the Akita Shinkansen and was upgraded to dual gauge.
       In Dutch East Indies (later Indonesia), dual-gauge track was installed in 1899 between Yogyakarta and Solo. The track was owned by the Nederlandsch-Indische Spoorweg Maatschappij, a private company, which built the gauge line in 1867. The third track was installed to allow passengers and goods traveling over the gauge Staatsspoorweg (State Railway) a direct connection without requiring transfer at both cities. Later, a separate pair of tracks were installed at the government's cost to allow greater capacity and higher speeds.
       In 1940 a third rail was installed between Solo and Gundih on the line to Semarang, allowing gauge trains to travel between Semarang, Solo and Yogyakarta (via Gambringan, on the line to Surabaya instead of via Kedungjati on the original line).
       A short section of dual-gauge and 2ft 5½in (750 mm) line existed in North Sumatra on a joint line of the Deli Railway and the Aceh Tramway. This line survived in to the 1970s.
       Some sugar mill railways in Java also have dual-gauge sections.
       In Vietnam, there's dual gauge (meter and standard) between Hanoi and the Chinese border. The length of Vietnam railway network In Sweden and Finland, there's about 4 km of dual gauge, 1435 and 1524 mm, between the railway stations in Haparanda and Tornio on each side of the border.
       In Los Angeles the Los Angeles Railway and the Pacific Electric Railway (both defunct) ran on dual gauge track on some downtown streets.

    Double dual gauge

    In Australia, the new railway line between Perth and Northam was being planned in the 1960s. The improved alignment was originally intended to have separate standard gauge and narrow gauge tracks running parallel, with crossing loops at intervals. However, the capacity of each of these lines would have been poor. By adopting double-track dual-gauge throughout, the line capacity was greatly increased, at only the relatively small extra cost of providing a third rail needed for dual gauge.

    Triple gauge

    There have been a few instances of triple-gauge break-of-gauge stations.
  • Port Pirie, South Australia, 1067 mm, 1435 mm, 1600 mm ( ) (1938-1970) Some survives in the Peterborough Railway Museum.
  • Gladstone, South Australia, 1067 mm, 1435 mm, 1600 mm ( ) (1970-1980s)
  • Peterborough, South Australia, 1067 mm, 1435 mm, 1600 mm ( ) (1970-1980s)
  • Latour-de-Carol, France, 1000 mm, 1435 mm, 1668 mm (still in use)
  • Hendaye, France, 1000 mm, 1435 mm, 1668 mm (still in use)
  • Växjö, Sweden, 891 mm, 1067 mm, 1435 mm (until at least 1974)
  • Montreux, Switzerland, 800 mm, 1000 mm, 1435 mm (still in use) Because these three triple-gauge examples were yards operating at low speed, light rail could be used to space the rails closely together if required. Main line operation at high speeds is another matter.
       The Niagara Falls Suspension Bridge originally carried trains of three different gauges.
       The National Railway Museum (Port Adelaide) in Adelaide, Australia not only has the three main line gauges, but also a 1' 6" gauge tourist line.

    Accidents on dual-gauge railways

    On September 9, 2004, an accident happened on a switch in Jindřichův Hradec, Czech Republic where dual-gauge railway bifurcates. An Junák express train from Plzeň to Brno derailed here because of a signalman's fault. He switched the switch to the narrow-gauge track although the express train used the standard-gauge one. Only the driver of the express train was slightly injured.
       In Western Australia, the signalling system detects the gauge of the approaching trains and puts the signals to stop if the route is set for the wrong gauge.

    Complexity of dual-gauge switches

    Dual-gauge turnouts (also known as switches or points), where both gauges have a choice of routes, are quite complicated, with more moving parts than single-gauge turnouts. They impose very low speed limits. If dual-gauge points are operated and detected by electrical circuits, their reliability will be high.
       Where two gauges separate (for example each gauge has only one route, as in the picture at right), few moving parts are needed.

    Paradox

    If the two gauges of a dual gauge turnout are very similar and the difference between them is small, the turnout will have many small pieces that are difficult to support and the turnout will be weak and limited in speed, and visa versa. The three gauges in Africa when configured as above have relatively large differences between the gauges and the turnout will be relatively strong and its speeds will be reasonable.

    Separate gauge

    If dual-gauge turnouts are too slow, or too difficult because the gauges are too similar, then an option is to build two separate lines, one of each gauge, side by side. This choice also depends on the amount of traffic. Dual-gauge could continue to be employed at an expensive bridge or tunnel. Examples include:
  • Albury, New South Wales to Melbourne, Victoria, 300 km
    • As the old and original broad gauge track declines in use, it's slated for conversion to standard gauge, replacing parallel standard-gauge single track and broad-gauge double track with a double-track standard-gauge line. This will reduce delays on the standard-gauge line at crossing loops.
  • Melbourne Victoria, to Geelong, Victoria, 80 km, a single standard-gauge line parallel to double-track broad gauge.
  • Yogyakarta-Solo in Java, Dutch East Indies during pre-WW II days, 58 km. This had a single line parallelling a dual-gauge and line.
  • In 2005 a proposed standard gauge line connecting Iran with China via several broad gauge Central Asian countries will use a mixture of parallel separate lines and dual gauge.
  • Australia - in 1960, the Perth to Northam line was originally to be separate side-by-side narrow gauge and standard gauge lines, but it was realised that line capacity would be much higher if it were built as double dual gauge.

    Overlapping gauges

    Bangladesh is tackling its break of gauge problem by adding a third rail to its broad and narrow gauge lines, so that it becomes a mainly dual-gauge system. The new Jamuna bridge that links the east and west rail systems is four rail dual gauge so that both gauges use the same centre-line. At some stage in the future, Bangladesh may choose one gauge over the other and convert to a single gauge, but there are no immediate plans for this.
       Bangladesh's neighbour to the east is also 1000mm gauge, should the missing link ever be built.
       A variation of overlapping gauge is to extend a railway of one gauge into territory that's mainly of another gauge so as to avoid transhipment of specific traffic. For example a 1524mm gauge line from an iron ore mine in Ukraine to a steelworks in Slovakia which now may be extended into Austria.

    Other methods of handling multiple gauges

    Other methods of handling multiple gauges include:
  • Transporter wagons or transporter trucks, which carry equipment of one gauge on the other's tracks.
  • Truck exchange systems, where the railroad car is lifted and the trucks/bogies under it are swapped. This system isn't suitable for four-wheel wagons.
  • Adjustable gauge equipment (variable gauge axles), in which the wheel gauge can be widened or narrowed.
  • Transshipment, where containers or people are transferred from one set of railroad cars to another.

    Dual gauge dual voltage

    A mini-metro in Gijon, Spain is to be both dual gauge (1000 mm/1668 mm) and dual voltage (1500 V DC/3000 V DC).
       

    Further Information

    Get more info on 'Dual Gauge'.


    External Link Exchanges

    Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:

      <a href="http://dual_gauge.totallyexplained.com">Dual gauge Totally Explained</a>

    Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
       As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned.



  • Copyright © 2007-8 totallyexplained.com | Licensed under the GNU Free Documentation License | Site Map
    This article contains text from the Wikipedia article Dual gauge (History) and is released under the GFDL | RSS Version